Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
POWER STEERING PUMP AND BRACKET REPLACEMENT (CONT)
2.
INSTALL CLAMP (5), washer (6), and bolt (7).
INSTALL FlTTING (8).
3.
4.
INSTALL union NUT (9) and compression
sleeve (10) in tube (11).
5.
INSTALL fillng (12) and TUBE (11).
6.
INSTALL power steering PUMP (13), four new
spring tension washers (14), and four bolts
(15).
INSTALL PULLEY (16) and new lock nut (17).
7.
ROTATE power steering PUMP (13) toward
8.
e n g i n e (18), CONNECT BELT (19), and
TURN adjusting SCREW (20) out until belt
tension of 1/2 in. (10-15 mm) is attained.
TIGHTEN NUT (21).
CONNECT HOSE assembly (22).
9.
10.
INSTALL new STRAP (23).
11.
TIGHTEN NUT (4) and lock NUT (17) to
66 Ib-ft (90 N.m).
NOTE
Follow-on Maintenance:
I n s t a l l front plate (TM 5-2420-
224-20).
Fill power steering reservoir
(LO 5-2420-224-12).
Lower cab (TM 5-2420-224-20).
7-16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business