Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
FRONT AXLE ASSEMBLY REPLACEMENT (CONT)
REMOVE SCREW (39), nut (40), and lock
30.
washer (41) from left front shock absorber
mount (42). DISCARD lock WASHER.
INSTALL left front shock ABSORBER (43),
31.
screw (39), nut (40), and new lock washer
(41). TIGHTEN to 177 Ib-ft (240 N.m).
REPEAT STEPS 30 and 31 for right front
32.
shock absorber.
LIFT VEHICLE and REMOVE jack STANDS.
33.
INSTALL control ARM (44), screw (45), new
34.
lock washer (46), screw (47), and new lock
nut (46). TIGHTEN to 133 Ib-ft (180 N.m).
INSERT drag link ball JOINT (49) into pitman
35.
arm (50) and INSTALL castellated NUT (51)
and new cotter pin (52). TIGHTEN NUT to
111 Ib-ft (150 N.m).
NOTE
Follow-on Maintenance:
Install front loader (SEE) or forklift
(HMMH) (TM 5-2420-224-20).
Install exhaust pipe (front) (TM 5-
2420-224-20).
Install front axle torsion bar
(TM 5-2420-224-20).
Lower cab (TM 5-2420-224-20).
Fill front axle center housing with
oil (LO 5-2420-224-12).
Fill wheel hub drive with oil
(LO 5-2420-224-12).
Fill transmission with fluid (LO 5-
2420-224-12).
B l e e d and test brakes (TM 5-
2420-224-20).
5-13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business