|
|
TM 5-2420-224-34
FRONT AXLE ASSEMBLY REPLACEMENT (CONT)
REMOVE SCREW (39), nut (40), and lock
30.
washer (41) from left front shock absorber
mount (42). DISCARD lock WASHER.
INSTALL left front shock ABSORBER (43),
31.
screw (39), nut (40), and new lock washer
(41). TIGHTEN to 177 Ib-ft (240 N.m).
REPEAT STEPS 30 and 31 for right front
32.
shock absorber.
LIFT VEHICLE and REMOVE jack STANDS.
33.
INSTALL control ARM (44), screw (45), new
34.
lock washer (46), screw (47), and new lock
nut (46). TIGHTEN to 133 Ib-ft (180 N.m).
INSERT drag link ball JOINT (49) into pitman
35.
arm (50) and INSTALL castellated NUT (51)
and new cotter pin (52). TIGHTEN NUT to
111 Ib-ft (150 N.m).
NOTE
Follow-on Maintenance:
Install front loader (SEE) or forklift
(HMMH) (TM 5-2420-224-20).
Install exhaust pipe (front) (TM 5-
2420-224-20).
Install front axle torsion bar
(TM 5-2420-224-20).
Lower cab (TM 5-2420-224-20).
Fill front axle center housing with
oil (LO 5-2420-224-12).
Fill wheel hub drive with oil
(LO 5-2420-224-12).
Fill transmission with fluid (LO 5-
2420-224-12).
B l e e d and test brakes (TM 5-
2420-224-20).
5-13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |