Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
CHASSIS WIRING HARNESS REPLACEMENT (CONT)
NOTE
Procedure is the same for both vehicles.
Make sure chassis wiring harness is secure and all hardware is tight.
Install new tiedown strap(s).
INSTALL chassis wiring HARNESS (1) in vehicle.
1.
2.
CONNECT six CONNECTORS (2) to front loader/forklift control valve (3).
3.
CONNECT two TERMINALS (4) to hydraulic oil cooler thermal switch (5).
4.
CONNECT 4-pin CONNECTOR (6) to frame wiring harness (7).
NOTE
Follow-on Maintenance:
Install tool and work light switches (TM 5-2420-224-20).
Install bucket and auxiliary throttle switches (SEE) or auxiliary throttle switch (HMMH)
(TM 5-2420-224-20).
Install work lights (TM 5-2420-224-20).
4-72

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business