Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
TRANSMISSION SHIFT CONTROLS REPLACEMENT (CONT)
2.
INSTALL spring (5), spherioal piece (6), and
COVER (7) on group seleotor lever (8).
INSTALL KNOB (9) and plate (10).
3.
4.
I N S T A L L group selector LEVER (8) in
transmission top cover (11) and ROTATE
COVER (7) to right to lock.
I N S T A L L BELLOWS (12) and TIGHTEN
5.
CLAMP (13).
INSTALL main shift LEVER (4) and ROTATE
6.
COVER (3) to right to lock.
7.
I N S T A L L BELLOWS (14) and TIGHTEN
CLAMP (15).
NOTE
Follow-on Maintenance:
I n s t a l l transmission shift lines
Install floor platform (TM 5-2420-
224-20).
3-98

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business