|
|
TM 5-2420-224-34
TRANSMISSION SHIFT LINES REPLACEMENT (CONT)
NOTE
Procedure is the same for all
three transmission shift lines.
1.
INSTALL transmission shift HOSE (1) in Iever
..
(2).
INSTALL VALVE (3) and three screws (4).
2.
SLIDE BELLOWS (5) DOWN lever (2) and
3.
INSTALL BELLOWS (5) in floor platform (6).
INSTALL knob (7), nut (8), and CAP (9).
4.
3-94
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |