Click here to make tpub.com your Home Page

Page Title: INSPECTION-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
TIMING GEAR COVER, GEARS, AND CASE REPLACEMENT (CONT)
NOTE
Prior to performing step 11, place
transmission shift control lever in
first gear position.
11. INSTALL vibration DAMPER (25), pulley (26),
bearing  SLEEVE  (27),  and  bolt (28).
TIGHTEN BOLT to 360-400 lb-ft (500-550
N.m).
NOTE
Follow-on Maintenance:
Install fan impeller (TM 5-2420-
224-20).
Install fan belt (TM 5-2420-224-
20).
Install counter engine revolution
(Hourmeter) (TM 5-2420-224-20).
Install fuel injection pump (page
3-62
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business