Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
FUEL INJECTION PUMP REPLACEMENT (CONT)
9.
USING SOCKET, CONNECT six injection TUBES (27) on fuel injection pump (6). TIGHTEN six
CAPNUTS to 18 Ib-ft (25 Nm).
10.
CONNECT timing gear case VENT (28).
NOTE
Follow-on Maintenance:
Install engine oil filter (page 3-20).
Time fuel injection pump (page 3-50).
Connect accelerator linkage (TM 5-2420-224-20).
Lower cab (TM 5-2420-224-20).
3-49

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business