Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
OIL COOLER AND GASKET REPLACEMENT (CONT)
INSTALLATION
1.
INSTALL PLUG (1) and new seal (2).
2.
INSTALL VALVE (3), spring (4), new packing (5), and plug (6).
CAUTION
Make sure all gasket material has been removed from mating surfaces to
p r e v e n t damage to equipment.
INSTALL oil cooler COVER (7) and new gasket (8) on cooler (9) and INSTALL 12 inner SCREWS (10)
3.
and 12 new metal seals (11). TIGHTEN SCREWS to 24 Ib-ft (35 N.m) using tightening sequence
shown.
3-32

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business