|
|
TM 5-2420-224-34
OIL COOLER AND GASKET REPLACEMENT (CONT)
INSTALLATION
1.
INSTALL PLUG (1) and new seal (2).
2.
INSTALL VALVE (3), spring (4), new packing (5), and plug (6).
CAUTION
Make sure all gasket material has been removed from mating surfaces to
p r e v e n t damage to equipment.
INSTALL oil cooler COVER (7) and new gasket (8) on cooler (9) and INSTALL 12 inner SCREWS (10)
3.
and 12 new metal seals (11). TIGHTEN SCREWS to 24 Ib-ft (35 N.m) using tightening sequence
shown.
3-32
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |