Click here to make tpub.com your Home Page

Page Title: TOW BAR INSTALLATION cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-20-1
VEHICLE TOWING (HMMH) (CONT)
7. Attach lift chains (6) to front lift points (7) and spreader bar (8).
8. Attach tow bar (1) to wrecker.
9. Move wrecker boom forward or backward to obtain proper boom-to-vehicle alinement.
10. Connect spreader bar (8) to wrecker boom. Raise front of vehicle until tires are 10-12 in.
(24.4-30.4 cm) off ground.
11. Place main shift lever in neutral, shift intermediate speed control in position H, Power Take-Off
in neutral, range-shift lever in stage II, and disengage four-wheel drive lever (TM 5-2420-224-10).
12. Release parking brake (TM 5-2420-224-10) and remove chocks.
13. Close shutoff valve (TM 5-2420-224-10).
2-30

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business