|
|
TM 5-2420-224-10
(a)
Activate HI/LO engine RPM switch (11).
(b)
Lower front loader to ground surface using front loader remote switch (17).
(c)
Extend boom to 45 degree angle with boom control lever (4).
(d)
Using dipper control lever (3), start dig cycle. Halfway through dig cycle begin to curl bucket
with bucket control lever (2). If bucket stalls, lift boom slightly.
(e)
On completing dig cycle, curl bucket completely, extend dipper, and swing to dump site with
swing control pedals (7 and 8).
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |