Click here to make tpub.com your Home Page

Page Title: Front Loader Operation (SEE). (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-10
(3)
Front Loader Shutoff Valves.
(a)
Turn levers (3) parallel to hydraulic line to open valve when front loader is in use.
(b)
Turn levers (3) 1/4 turn to close valve when front loader is stowed for travel.
(4)
Lowering Bucket.
(a)
Remove two retaining pins (4) from two travel lock plates (5).
(b)
Start vehicle and raise front loader so travel lock plates (5) release from retaining pins (4).
(c)
Lower front loader to ground and shut down vehicle.
(d)
Lock two travel lock plates (5) in stowed position by installing two retaining pins (4).
WARNING
Be careful at all times. Keep area clear of unauthorized personnel. Know
location of authorized personnel in area. Failure to do so could result in
personnel injury.
Before operating front loader in an area where your visibility is reduced (next to a
building, etc.), install guard rail and warning signs to keep other personnel away
from your machine. Failure to do so could result in personal injury.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business