| |
TM 5-2420-222-20-3
LOADER BUCKET LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
NOTE
Right side bucket linkage has indicator pivot, left side bucket linkage has washer.
22.
Loader bucket
Two front guide
Place in position.
cylinder piston
links (7 and 8),
rod (12)
indicator pivot (13)
or washer (14), and
bucket link (1)
23.
Two front guide
Pin (15)
a.
Have assistant aline pin holes of links
links (7 and 8),
(1, 7, and 8), pivot (13) or washer
bucket link (1),
(14), and rod (12).
indicator pivot (13)
b.
Using 3-pound head cross-peen
or washer (14),
and hammer, tap in.
loader bucket
cylinder piston
rod (12)
2-1849
|