Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: LOADER BUCKET LINKAGE
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-20-3 LOADER BUCKET LINKAGE This task covers: a.   Removal (page 2-1844) e. Repair (page 2-1848) b.   Disassembly (page 2-1846) f. Assembly (page 2-1848) c.   Cleaning (page 2-1847) g. Installation (page 2-1848) d.   Inspection/Replacement (page 2-1848) INITIAL SETUP: Tools Materials/Parts Driftpin, brass-tipped, 3/4-inch Rags, wiping (item 21, Appendix C) Hammer, cross-peen, 3-pound head Solvent, drycleaning (item 28, Appendix C) Handle, ratchet, 1/4-inch drive Lifting equipment, 1000-pound Personnel Required capacity Pliers, retaining ring Two Press, arbor Remover and installer, 2-inch Socket, 1/4-inch drive, 7/16-inch Thread set, pipe ACTION LOCATION ITEM REMARKS NOTE Loader  backhoe  has  two  sets  of  loader  bucket  linkage.    Both  are  maintained  the same way except as noted.  Right side is shown.  Repeat procedures for left side as needed. REMOVAL 1. Loader bucket (1) Two rings (3) Using retaining ring pliers, take off. and pin (2) 2. Two front guide Four rings (8 and 9) Using retaining ring pliers, take off. links (4 and 5) and two pins (6 and 7) 2-1844

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business