TM 5-2420-222-20-3
LOADER BUCKET LINKAGE
This task covers:
a. Removal (page 2-1844)
e.
Repair (page 2-1848)
b. Disassembly (page 2-1846)
f.
Assembly (page 2-1848)
c. Cleaning (page 2-1847)
g.
Installation (page 2-1848)
d. Inspection/Replacement (page 2-1848)
INITIAL SETUP:
Tools
Materials/Parts
Driftpin, brass-tipped, 3/4-inch
Rags, wiping (item 21, Appendix C)
Hammer, cross-peen, 3-pound head
Solvent, drycleaning (item 28, Appendix C)
Handle, ratchet, 1/4-inch drive
Lifting equipment, 1000-pound
Personnel Required
capacity
Pliers, retaining ring
Two
Press, arbor
Remover and installer, 2-inch
Socket, 1/4-inch drive, 7/16-inch
Thread set, pipe
ACTION
LOCATION
ITEM
REMARKS
NOTE
Loader backhoe has two sets of loader bucket linkage. Both are maintained the
same way except as noted. Right side is shown. Repeat procedures for left side
as needed.
REMOVAL
1.
Loader bucket (1)
Two rings (3)
Using retaining ring pliers, take off.
and pin (2)
2.
Two front guide
Four rings (8 and 9)
Using retaining ring pliers, take off.
links (4 and 5)
and two pins
(6 and 7)
2-1844
|