| |
TM 5-2420-222-20-3
LOADER BUCKET LEVEL INDICATOR - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
16.
Pin (1)
Ring (2)
Using retaining ring pliers, put on.
17.
Loader bucket
Indicator guide
Place in position.
cylinder head (3)
tube (4)
18.
Indicator guide
Two new lockwashers
Screw in and tighten using 9/16-inch, 1/2-
tube (4)
(5) and screws (6)
inch drive socket and ratchet handle.
19.
Bucket indicator
Push in.
rod (7)
20.
Bucket indicator
Nut (8)
Screw on as far as possible.
rod (7)
21.
Indictor pivot (9)
Bucket indicator rod
Push in until nut (8) is seated against
(7) with assembled
pivot (9).
nut (8)
22.
Bucket indicator
Nut (10)
Screw on until number of exposed threads
rod (7)
on rod (7) are same as noted during removal.
23.
Bucket indicator
Nut (8)
Using 11/16-inch open-end wrench,
rod (7) and
tighten against pivot (9).
indicator pivot (9)
ADJUSTMENT
NOTE
Loader backhoe must be parked on level ground with loader bucket resting on ground for correct
adjustment to be made.
24.
Indicator guide
Bucket indicator
Note relative positions.
tube (4)
rod (7)
Rod end should be flush with end of
tube.
NOTE
If end is flush with end of tube, skip steps 25 thru 27.
2-1842
|