Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: BACKHOE BUCKET - CONTINUED
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-20-3 BACKHOE BUCKET - CONTINUED ACTION LOCATION ITEM REMARKS 60. Pin (4) and Cotter pin (6) a. Using multiple tongue and groove slip- special washer (5) joint pliers, straighten ends. b. Using 1/4-inch straight drive-pin punch and 2-pound head ball-peen hammer, drive out. c. If not just replaced during installation, get rid of. 61. Pin (4) and Special washer (5) Take off. inner bucket (7) 62. Pin (8) and Ring (9) On loader backhoes equipped with retaining inner bucket (7) rings, using retaining ring pliers, take off. 63. Guide link (10), Pin (4 and 8) Using 3/4-inch brass-tipped driftpin and two coupler links 2-pound head ball-peen hammer, drive (11), and backhoe out. bucket cylinder piston rod (12) 2-1811

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business