| |
TM 5-2420-222-20-3
LOADER BUCKET CYLINDERS - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
30.
Loader bucket
Two front guide
Place into position.
cylinder (1)
links (13 and 14),
indicator pivot (15)
or washer (16), and
bucket link (17)
31.
Two front guide
Pin (18)
Using 3-pound head cross-peen hammer,
links (13 and 14),
drive in.
indicator pivot (15)
or washer (16),
loader bucket
cylinder (1), and
bucket link (17)
32.
Two front guide
Two rings (19)
Using snapring pliers, put on.
links (13 and 14)
and pin (18)
2-1767
|