| |
TM 5-2420-222-20-3
JAW CYLINDER
This task covers:
a. Removal (page 2-1704)
d. Inspection/Replacement (page 2-1706)
b. Disassembly (page 2-1704)
e. Assembly (page 2-1706)
c. Cleaning (page 2-1704)
f. Installation (page 2-1706)
INITIAL SETUP:
Tools
Materials/Parts
Block, wood
Pin, cotter, jaw cylinder pin
Driftpin, brass-tipped, 3/4-inch
Rags, wiping (item 21, Appendix C)
Hammer, ball-peen, 2-pound head
Solvent, drycleaning (item 28, Appendix C)
Handle, ratchet, 1/4-inch drive
Pliers, retaining ring
Personnel Required
Pliers, slip-joint, multiple tongue
and groove
Two
Punch, drive-pin, straight, 1/4-inch
Socket, 1/4-inch drive, 5/16-inch
Equipment Condition
Wrench, open-end, 7/16-inch
1.
Backhoe bucket jaw open
(TM 5-2420-222-10)
2.
Jaw cylinder oil hoses removed
(page 2-1544)
2-1703
|