Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: LOADER CONTROL VALVE-TO-LOADER BOOM CYLINDER ROD END OIL LINES- CONTINUED
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-20-3 LOADER CONTROL VALVE-TO-LOADER BOOM CYLINDER ROD END OIL LINES - CONTINUED ACTION LOCATION ITEM REMARKS 35. Adapter (1) Hose (2) a. Take off tag. b. Screw on and tighten using 7/8-inch and 1-inch open-end wrenches. 36 Hose (2) and Clamp (4) Screw on and tighten to same relative loader boom position as noted during removal using cylinder (3) 1/4-inch flat-tip screwdriver. 37. Loader Transmission Check fluid level and add proper amount backhoe and grade (TM 5-2420-222-10). 38. Engine Start and run at high idle (TM 5-2420-222-10). 39. Loader control a. Operate lift arms (TM 5-2420-222-10) valve-to-loader and check for leaks. boom cylinder b. If leaking at any connection, tighten rod end oil lines using 7/8-inch and 1-inch open-end wrenches. c. If leaking does not stop, shut down engine CTM 5-2420-222-10) and replace leaking connection packing, hose, or fitting as outlined in this task. d. If found leaking, repeat steps 37 thru 39. 40. Engine If still running, shut down (TM 5-2420-222-10). 2-1696

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business