TM 5-2420-222-20-3
LOADER CONTROL VALVE-TO-LOADER BOOM CYLINDER ROD END OIL LINES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
24.
Loader control
Nut (3)
Using two 1-inch open-end wrenches,
valve (1) and
tighten until seated against control
tee (2)
valve (1).
25.
Tee (2)
Union (4)
Screw in and tighten using 7/8-inch and
1-inch open-end wrenches.
26.
Loader
Hose (5)
Route into position as noted during
backhoe
removal.
27.
Union (4)
Hose (5)
Screw on and tighten using 7/8-inch and
1-inch open-end wrenches.
28.
Tee (2)
Hose (6)
Screw on and tighten using 7/8-inch and
1-inch open-end wrenches.
NOTE
If installing loader control valve-to-right loader boom cylinder rod end oil line, skip steps 29 thru
31.
Only loader backhoes with Serial Numbers 319995 thru 342573 are equipped with spacer between
clamp and hoses.
29.
Left side
Clamp (8),
Place into position as noted during
frame (7)
spacer (9), if
removal.
present, and
four hoses
(5, 10, 11, and 12)
30.
Left side
Screw (13) and
Screw in and tighten using 9/16-inch,
frame (7),
new lockwasher (14)
3/8-inch drive socket and ratchet handle.
clamp (8), and
spacer (9)
31.
Four hoses
Take off tags.
(5, 10,11 and 12)
2-1694
|