Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: LOADER CONTROL VALVE-TO-LOADER BOOM CYLINDER ROD END OIL LINES- CONTINUED
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-20-3 LOADER CONTROL VALVE-TO-LOADER BOOM CYLINDER ROD END OIL LINES- CONTINUED ACTION LOCATION ITEM REMARKS 1. Adapter (1) Hose (2) a. Place drain pan underneath. b. Using 7/8-inch and 1-inch open-end wrenches, unscrew and take out. c. Tag (page 2-137). 2. Hose (2) and Clamp (4) a. Note relative position for proper loader boom placement during installation. cylinder (3) b. Using 1/4-inch flat-tip screwdriver, loosen and take off. 3. Loader boom Adapter (1) a. Place drain pan underneath. cylinder (3) with assembled b. Using 1-inch open-end wrench, packing (5) unscrew and take out. 4. Adapter (1) Packing (5) a. Using pocket knife, take off. b. Get rid of. 2-1689

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business