| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE-TO-LOADER BOOM CYLINDER ROD END OIL LINES- CONTINUED
ACTION
LOCATION
ITEM
REMARKS
1.
Adapter (1)
Hose (2)
a.
Place drain pan underneath.
b.
Using 7/8-inch and 1-inch open-end
wrenches, unscrew and take out.
c.
Tag (page 2-137).
2.
Hose (2) and
Clamp (4)
a.
Note relative position for proper
loader boom
placement during installation.
cylinder (3)
b.
Using 1/4-inch flat-tip screwdriver,
loosen and take off.
3.
Loader boom
Adapter (1)
a.
Place drain pan underneath.
cylinder (3)
with assembled
b.
Using 1-inch open-end wrench,
packing (5)
unscrew and take out.
4.
Adapter (1)
Packing (5)
a.
Using pocket knife, take off.
b.
Get rid of.
2-1689
|