Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: LOADER CONTROL VALVE-TO-LOADER BOOM CYLINDER HEAD END OIL LINES - CONTINUED
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-20-3 LOADER CONTROL VALVE-TO-LOADER BOOM CYLINDER HEAD END OIL LINES - CONTINUED ACTION LOCATION ITEM REMARKS NOTE If installing loader control valve to right loader boom cylinder oil line, skip steps 25 thru 27. 25. Left side Clamp (8), Place into position as noted during frame (7) spacer (9), if removal. present, and four hoses (1, 10, 11, and 12) 26. Left side frame (7), Screw (13) and Screw in and tighten using 9/16-inch, clamp (8), and lockwasher (14) 3/8-inch drive socket and ratchet handle. and spacer (9), if present 27. Four hoses Take off tags. (1, 10, 11, and 12) 2-1685

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business