| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE-TO-LOADER BUCKET CYLINDER HEAD END OIL LINES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
27.
Tee (7)
Union (9) with
a.
Uncap.
assembled parts
b.
Take off tag.
c.
Unplug tee(7).
d.
Screw in and tighten using two 1-inch
open-end wrenches.
NOTE
If installing loader control valve-to-right loader bucket cylinder oil line, skip steps 28 thru 30.
28.
Left side
Four hoses (1, 11,
Place in same relative positions noted
frame (10)
12, and 13), spacer
during removal.
(14), and clamp (15)
29.
Left side
Screw (16) and new
Screw in and tighten using 9/16-inch,
frame (10),
lockwasher (17)
3/8-inch drive socket and ratchet
spacer (14)
handle.
2-1667
|