| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE-TO-LOADER BUCKET CYLINDER HEAD END OIL LINES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1.
Line (1)
Hose (2)
a.
Place drain pan underneath.
b.
Using 7/8-inch and 1-inch open-end
wrenches, unscrew and take out.
c.
Tag (page 2-137).
2.
Loader bucket
Two clamps
a.
Note relative positions for proper
cylinder (3) and
(5 and 6)
placement during installation.
two oil lines
b.
Using 1/4-inch flat-tip screwdriver,
(1 and 4)
loosen and take off.
3.
Adapter (7)
Oil line (1)
a.
Place drain pan underneath.
b.
Using 7/8-inch and 1-inch open-end
wrenches, unscrew and take out.
c.
Tag (page 2-137).
4.
Loader bucket
Adapter (7)
a.
Using 1-inch open-end wrench,
cylinder (3)
with assembled
unscrew and take out.
packing (8)
b.
Plug cylinder (3) (page 2-137).
5.
Adapter (7)
Packing (8)
a.
Using pocket knife, take off.
b.
Get rid of.
NOTE
If removing loader control valve-to-right loader bucket cylinder oil line, skip steps 6 thru
8.
6.
Left side frame (9),
Four hoses
Tag (page 2-137).
spacer (10) and
(2, 12, 13, and 14)
clamp (11)
7.
Screw (15) and
a.
Using 9/16-inch, 3/8-inch drive
lockwasher (16)
socket and ratchet handle, unscrew and
take out.
b.
Get rid of lockwasher (16).
8.
Left side
Clamp (11),
a.
Note relative position of hoses
frame (9)
spacer (10) and
(2, 12, 13, and 14) for proper
four hoses (2, 12,
placement during installation
13 and 14)
b.
Take off.
2-1662
|