| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE
This task covers:
a.
Removal (page 2-1286)
d.
Inspection/Replacement (page 2-1289)
b.
Disassembly (page 2-1288)
e.
Assembly (page 2-1290)
c.
Cleaning (page 2-1288)
f.
Installation (page 2-1290)
INITIAL SETUP
Tools
Materials/Parts - Continued
Handle, ratchet, 1/2-inch drive
Packing, tee-to-valve (two required)
Knife, pocket
Packing, long tee-to-valve (two required)
Pan, drain
Rags, wiping (item 21, Appendix C)
Socket, 1/2-inch drive, 3/4-inch
Solvent, drycleaning (item 28, Appendix C)
Vise, machinists
Tags, marking (item 30, Appendix C)
Wrench, open-end, 7/8-inch
Wrench, open-end, 1-inch
Personnel Required
(two required)
Wrench, open-end, 1 1/4-inch
Two
(two required)
Equipment Condition
Materials/Parts
Loader control valve handle and linkage
Lockwasher, valve screw
removed (page 2-1324)
(three required)
Packing, connector-to-valve
Packing, special connector-to-valve
2-1285
|