| |
TM 5-2420-222-20-2
IDENTIFICATION AND NAME PLATES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
3. Identification plate
Two drive
b. If holes go all the way through mount-
(1) and front
screws (3)
ing surface, using 3/32-inch straight
support (2) -
drive-pin punch and 1-pound head ball-
Continued
peen hammer, drive out shafts.
c.
If holes do not go all the way through
mounting surface, using twist drill set
and 1/2-inch portable electric drill,
drill out shafts.
d. Get rid of.
4. Front support (2)
Identification
Take off.
plate (1)
NOTE
Some identification and name plates are mounted with blind rivets. One name plate is shown. Repeat
steps 5 and 6 as necessary for other plates mounted with blind rivets. Number of rivets may vary.
5. Name plate (4) and
Three blind
a. Using 1/2-inch cold chisel and 1-pound
loader boom (5)
rivets (6)
head ball-peen hammer, cut off heads.
b. Using 1/8-inch straight drive-pin punch
and 1-pound head ball-peen hammer,
drive out shafts.
c. Get rid of.
6. Loader boom (5)
Name plate (4)
Take off.
INSTALLATION
NOTE
Identification and name plates are mounted two ways. Some identification plates are mounted with drive
screws, some with blind rivets. One identification plate is shown. Repeat steps 7 and 8 as necessary for
other plates mounted with drive screws. Number of drive screws may vary.
7. Front support (2)
Identification
Place in position.
plate (1)
8. Identification
Two new drive
Using 1-pound head ball-peen hammer,
plate (1) and front
screws (3)
drive in.
support (2)
2-1184
|