| |
TM 5-2420-222-20-2
SERVICE BRAKE PEDALS
This task covers:
a.
Removal (page 2-892)
e.
Assembly (page 2-894)
b.
Disassembly (page 2-892)
f.
Installation (page 2-895)
c.
Cleaning (page 2-893)
g.
Adjustment (page 2-896)
d.
Inspection/Replacement (page 2-894)
INITIAL SETUP:
Tools
Materials/Parts
Bar, pry, 15 to 16-inch
Rags, wiping (item 21, Appendix C)
Extension, 3/8-inch drive, 5-inch
Solvent, drycleaning (item 28, Appendix C)
Hammer, ball-peen, 1-pound head
Hammer, plastic-faced
Personnel Required
Pliers, retaining ring
Press, arbor
One
Punch, straight drive-pin, 1/8-inch
Punch, straight drive-pin, 1/4-inch
Equipment Condition
Remover and installer, 0.6875-inch
outside diameter
1.
Right platform removed (page 2-1079)
Socket, 3/8-inch drive, 9/16-inch
2
Right inner platform ramp removed
Vise, machinists
(page 2-1095)
Wrench, open-end, 7/16-inch
Wrench, open-end, 9/16-inch
(two required)
2-891
|