TM 5-2420-222-20-2
SPEED GEAR ASSEMBLY (REVERSER) CONTROL LEVER
This task covers:
a.
Removal (page 2-704)
d.
Inspection/Replacement (page 2-706)
b.
Disassembly (page 2-705)
e.
Assembly (page 2-707)
c.
Cleaning (page 2-705)
f.
Installation (page 2-708)
INITIAL SETUP:
Tools
Materials/Parts - Continued
Hammer, ball-peen, 1-pound head
Rags, wiping (item 21, Appendix C)
Pliers, slip-joint
Solvent, drycleaning (item 28, Appendix C)
Punch, drive-pin, straight, 1/8-inch
Punch, drive-pin, straight, 5/32-inch
Personnel Required
Vise, machinists
One
Materials/Parts
Equipment Conditions
Detergent, GP (item 7, Appendix C)
Pin, cotter, lever
1.
Cowl removed (page 2-1006)
Pin, cotter, pin
2.
Left outer platform ramp removed
(page 2-1073)
3.
Left platform removed (page 2-1060)
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1.
Pin (1)
Cotter pin (2)
a.
Using slip-joint pliers, straighten
ends and take out.
b.
Get rid of.
2.
Adjustable yoke (3)
Pin (1)
Take out.
and control arm (4)
3.
Control arm (4)
Adjustable yoke (3)
Take off.
4.
Control arm (4)
Spring pin (6)
Using 1-pound head ball-peen hammer and
and lever (5)
1/8-inch straight drive-pin punch,
drive out.
5.
Lever (5)
Control arm (4)
Take off.
6.
Bushing (7) and
Cotter pin (8)
a.
Using slip-joint pliers, straighten
lever (5)
ends and take out of lever.
b.
Get rid of.