| |
TM 5-2420-222-20-2
SPEED GEAR ASSEMBLY (REVERSER) CONTROL LEVER LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
REMOVAL - CONTINUED
11.
Shaft (1 or 2) and
Groove pin (4)
a.
Rotate shaft (1 or 2) until pin (4)
control shaft
is accessable.
arm (3)
b.
Using 1-pound head ball-peen hammer
and 1/8-inch straight drive-pin punch,
drive out.
12.
Shaft (1 or 2) and
Ring (6)
Using 3/16-inch flat-tip screwdriver,
washer (5)
pry off.
13.
Shaft (1 or 2) and
Washer (5)
Take off.
reverser housing (7)
14.
Reverser housing (7)
Shaft (1 or 2)
Slide out.
and control shaft
arm (3)
15.
Reverser housing (7)
Control shaft
Take off.
arm (3)
DISASSEMBLY
16.
Adjustable yoke
Nut (10)
a.
Place link (9) in machinists vise.
(8) and link (9)
b.
Using 1/2-inch open-end wrench,
loosen.
17.
Link (9)
Adjustable yoke (8)
a.
Note number of exposed threads on
and nut (10)
link (9) and relative position of
yoke (8).
b.
Unscrew and take off.
c.
Take link (9) out of machinists vise.
NOTE
Steps 18 and 19 only apply to loader backhoes with Serial Numbers 235786 thru 235999.
18.
Shaft (1) and
Groove pin (12)
a.
Place shaft (1) in machinists vise.
control lever
b.
Using 1/8-inch straight drive-pin
arm (11)
punch and 1-pound head ball-peen
hammer, drive out.
2-818
|