Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-222-20-1
RADIATOR - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
ASSEMBLY - CONTINUED
40.
Tie rod (1)
New special
a. Secure tie rod (1) is machinist's vise.
nut (2) and
b. Using 9/16-inch open-end wrench,
washer (3)
screw on all the way.
c.  Take tie rod (1) out of machinist's vise.
41.
Radiator (4)
Overflow hose (5)
a. Push onto nipple on radiator neck.
b. Push into clips.
42.
Draincock (6)
Screw in and tighten using 9/16-inch
open-end wrench.
43.
Oil cooler (7)
Put on.
with assembled
packings
44.
Oil cooler (7)
Four washers (8),
Screw on and tighten using 1/2-inch
and radiator (4)
new lockwashers (9),
open-end wrench.
and nuts (10)
INSTALLATION
45.
Front support (11)
Packing (12) and
a. If removed, apply metal adhesive in
baffle (13)
0.06 to 0.18-inch (1.52 to 4.57 mm)
wide beads.
Make sure that outside beads are with-
in 0.25-Inch (6.35 mm) of where
edge of baffle will be.
b. Press against front support (11) to
transfer some metal adhesive.
c.  Take off and allow metal adhesive to
set for two minutes.
d. Press firmly into place.
46.
Two rubber washers
Put in place.
(14 and 15)
47.
Fan (16)
Fan shroud (17)
Hang on.
2-380

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business