|
|
TM 5-2420-222-20-1
AIR INLET HOUSING
This task covers:
a.
Removal (page 2-232)
e.
Repair (page 2-234)
b.
Disassembly (page 2-233)
f.
Assembly (page 2-235)
c.
Cleaning (page 2-234)
d.
Installation (page 2-235)
d.
Inspection/Replacement (page 2-234)
INITIAL SETUP:
Tools
Materials/Parts
Handle, ratchet, 1/2-inch drive
Gasket, air inlet
Screwdriver, flat-tip, 1/4-inch
Lockwasher, air inlet screw (two required)
Socket, 1/2-inch drive, 9/16-inch
Rags, wiping (item 21, Appendix C)
Thread set, pipe
Solvent, drycleaning (item 28, Appendix C)
Wrench, open-end, 5/16-inch
Wrench, open-end, 3/8-inch
Personnel Required
Wrench, open-end, 7/16-inch
Wrench, open-end, 3/4-inch
One
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1. Hose (1)
Two clamps (2)
Using 1/4-inch flat-tip screwdriver,
loosen.
2. Air inlet (3) and
Hose (1) with
Slide off.
pipe (4)
assembled two
clamps (2)
WARNING
Ether burns easily. If engine starting aid is not properly installed, do not release ether In confined areas or near open
flame. Engine primer fluid cylinder is pressurized to expel ether when fluid injection solenoid is activated. Do not heat
engine primer fluid cylinder or place it in fire.
3. Elbow (5)
Nut (6)
Using 3/8-inch open-end wrench, unscrew
and take off.
4.
Tube (7) with
Pull out.
assembled nut (6)
2-232
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |