|
|
TM 5-2410-237-23
WINCH CONTROL VALVE REPAIR - CONTINUED
0245 20
ASSEMBLY - CONTINUED
11.
Install new preformed packing (78) on plug (77).
Install plug.
12.
Install valve spool (76) and spring (75) on sequence
valve (64).
13.
If removed, install pin (74) in retainer (73).
14.
Install retainer (73) with pin (74) on sequence valve
(64).
15.
Install new preformed packing (72) on plug (71).
16.
Install new preformed packing (70) on plug (69).
25
Install plug (69) on plug (71).
17.
Install plug (71) in sequence valve (64).
77
18.
Install new preformed packing (68) in sequence valve
67
64
(64). Install new gasket (67) on sequence valve.
19.
Place sequence valve (64) in position on pressure con-
78 62
trol valve (25). Install new lockwasher (66) and cap-
screw (65) to secure sequence valve to pressure
control valve.
20.
Install three new lockwashers (63) and three cap-
68
63
screws (62) on sequence valve (64).
64
69
71
66
65
74
75
76
70
72
73
421-0184
Change 1
0245 20-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |