Click here to make tpub.com your Home Page

Page Title: ASSEMBLY - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
WINCH CONTROL VALVE REPAIR - CONTINUED
0245 20
ASSEMBLY - CONTINUED
11.
Install new preformed packing (78) on plug (77).
Install plug.
12.
Install valve spool (76) and spring (75) on sequence
valve (64).
13.
If removed, install pin (74) in retainer (73).
14.
Install retainer (73) with pin (74) on sequence valve
(64).
15.
Install new preformed packing (72) on plug (71).
16.
Install new preformed packing (70) on plug (69).
25
Install plug (69) on plug (71).
17.
Install plug (71) in sequence valve (64).
77
18.
Install new preformed packing (68) in sequence valve
67
64
(64). Install new gasket (67) on sequence valve.
19.
Place sequence valve (64) in position on pressure con-
78 62
trol valve (25). Install new lockwasher (66) and cap-
screw (65) to secure sequence valve to pressure
control valve.
20.
Install three new lockwashers (63) and three cap-
68
63
screws (62) on sequence valve (64).
64
69
71
66
65
74
75
76
70
72
73
421-0184
Change 1
0245 20-10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business