Click here to make tpub.com your Home Page

Page Title: ASSEMBLY - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
WINCH ASSEMBLY REPAIR - CONTINUED
0245 19
ASSEMBLY - CONTINUED
9.
Install Idler Gears.
a.
Cool bearing cups (20) to approximately 32F (0C).
b.
Install inner bearing cup (20) in case (5).
c.
Install outer bearing cup (20) in bearing cage (10).
WARNING
Hot oil or metal parts can cause severe burns. Wear insulated gloves, long sleeves and eye protection when
working with heated parts.
d.
Heat bearing cones (18 and 19) in oil to a maximum of 275F (135C).
e.
Install bearing cones (18 and 19) on ends of pinion gear (17).
10
20
19
14
15
5
16
17
18
20
30
421-0188
Change 1
0245 19-42

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business