Click here to make tpub.com your Home Page

Page Title: PRESSURE RELIEF VALVE TESTS (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
HYDRAULIC SYSTEM TESTS - CONTINUED
0227 00
PRESSURE RELIEF VALVE TESTS - CONTINUED
c.
If equipped with a ripper, run engine at low idle
2
and raise ripper until lift cylinders bottom out.
Main relief valve should open 2250 + 50 or 0 psi
(15,513 + 344 or 0.0 kPa).
d.
Block hose (2) at both blade lift cylinders.
(1)
Disconnect hose (2) at lift cylinder head
(2)
Install O-ring and cover and reconnect
hose (2).
387-786
e.
With engine at low idle, operate blade control lever to extend lift cylinders. Main relief valve should open at 2250
+/- 50 or 0 psi (15,513 +/- 344 or 0.0 kPa).
f.
Shut down engine. Move all hydraulic control levers to all positions to relieve pressure in lines. Return all control
levers to HOLD position.
g.
Remove block in line to blade lift cylinders.
(1)
Disconnect hose (2) (WP 0220 00).
(2)
Remove O-ring and cover and reconnect hose (2).
NOTE
One 0.005 in. shim will change relief pressure by 35 psi (240 kPa).
One 0.048 in. shim will change relief pressure by 335 psi (2310 kPa).
h.
To adjust main relief valve setting, perform Relief Valve Setting Adjustment in WP 0201 00.
0227 00-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business