Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
RIPPER LIFT CYLINDER REPLACEMENT - CONTINUED
0223 00
INSTALLATION
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may result in injury or death.
NOTE
Ripper lift cylinder weighs 195 lb (89 kg).
Connecting link weighs 227 lb (126 kg).
1.
Attach a nylon sling and a suitable lifting device to lift cylinder (6) and move cylinder into position at frame assembly
(14).
2.
Instal pin assembly (17), plate (16) and two bolts (15).
3.
Lower lift cylinder (6) to wood block (8).
4.
Remove nylon sling and lifting device from lift cylinder (6).
5.
Attach nylon sling and lifting device to connecting link (9) and lift cylinder (6).
6.
Align hole in connecting link (9) with hole in lift cylinder (6) and install pin assembly (12), plate (11) and two bolts
(10).
7.
Remove nylon sling and lifting device from connecting link (9) and lift cylinder (6).
8.
Remove wood blocks (8 and 13).
CAUTION
Wipe all sealing surfaces and hose connections clean and dry before installation. Contamination of hydrau-
lic system could result in premature failure.
NOTE
Lightly coat new O-rings with clean oil before installation.
9.
Install new O-ring (7) in hose assembly (4).
10.
Connect hose assembly (4) to tube assembly (5) on lift cylinder (6) with two flanges (3), four washers (2) and capscrews
(1).
11.
Repeat steps 9 and 10 to connect other hose assembly (4).
12.
Apply GAA grease to grease fittings at lift cylinder, connecting link and frame assembly.
13.
Refill hydraulic tank and bleed air from system, if necessary (WP 0225 00).
14.
Start engine, operate ripper lift cylinder and check for proper operation and leaks (TM 5-2410-237-10).
END OF WORK PACKAGE
0223 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business