|
|
TM 5-2410-237-23
RIPPER LIFT CYLINDER REPLACEMENT - CONTINUED
0223 00
REMOVAL
1.
Remove four capscrews (1), washers (2), two flanges (3) and disconnect hose assembly (4) from tube assembly (5) on
lift cylinder (6).
2.
Remove O-ring (7) from hose assembly (4). Discard O-ring.
3.
Repeat steps 1 and 2 to disconnect other hose assembly (4).
4.
Place wood block (8) under lift cylinder (6) and connecting link (9).
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may result in injury or death.
NOTE
Ripper lift cylinder weighs 195 lb (89 kg).
Connecting link weighs 227 lb (126 kg).
5.
Attach a nylon sling and a suitable lifting device to lift cylinder (6) and connecting link (9).
6.
Remove two bolts (10), plate (11) and pin assembly (12).
7.
Lower lift cylinder (6) and connecting link (9) onto wood block (8).
8.
Remove nylon sling and lifting device from lift cylinder (6) and connecting link (9).
9.
Attach nylon sling and lifting device to lift cylinder (6).
10.
Place wood block (13) under frame assembly (14).
11.
Remove two bolts (15), plate (16) and pin assembly (17) from lift cylinder (6) and frame assembly (14).
12.
Remove lift cylinder (6).
13.
Remove nylon sling and lifting device from lift cylinder (6).
11
4
12
10
9
3
7
4
5
1
1
2
2
7
8
3
6
14
6
15,16,17
13
0223 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |