Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
RIPPER CONTROL LEVER AND LINKAGE REPLACEMENT - CONTINUED
0208 00
INSTALLATION
NOTE
Lightly coat bearings and pivot points with GAA grease before installation. After installation, remove
excess grease with a rag.
1.
Install two bearings (32) in ripper control lever (4).
2.
Secure bracket (26) in vise. Install ripper control lever (4) to bracket with shaft (31).
3.
Align hole in shaft (31) with hole in bracket (26) and install pin (30).
4.
Install boot flange (18) on boot (19) and slide both onto lower rod (20).
5.
Install nut (29) and rod end (28) on lower rod (20). Do NOT tighten nut.
6.
Adjust rod end (28) and install rod end in ripper control lever (4) with new self-locking nut (27).
7.
Position bracket (26) to control console (8) and install with two washers (25) and capscrews (24).
8.
Connect lower rod (20) to ripper pilot valve (23) with pin (22) and new cotter pin (21). Tighten nut (29).
9.
Slide boot (19) down over end of lower rod (20).
10.
Install boot flange (18) with two washers (17) and capscrews (16).
11.
Install spring (15) and dome (14) on ripper control lever (4).
4
14
4
27
15
31
28
32
32
29
24
25
16
26
17
18
30
8
20
19
22
21
23
387-653
0208 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business