Click here to make tpub.com your Home Page

Page Title: INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
BLADE CONTROL LEVER AND LINKAGE REPLACEMENT - CONTINUED
0207 00
INSTALLATION - CONTINUED
9.
Install nut (37) and rod end (38) on each end of rod (33). Do NOT tighten nuts at this time.
10.
Install lower end of rod (33) assembly to lever at blade control valve with bolt (36) and two nuts (35).
11.
Install top end of rod (33) assembly in lever (34) with bolt (32) and two nuts (31). Do NOT tighten nuts at this time.
36
35
35
37
33
37
32
31
33
39,40,41
34
42
38
387-643
0207 00-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business