Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
HYDRAULIC PRESSURE CONTROL VALVE REPLACEMENT - CONTINUED
0203 00
INSTALLATION
CAUTION
Clean hose fittings and ends of all hoses before installation to prevent contamination of hydraulic system.
NOTE
If replacing hydraulic control valve, transfer all fittings from old valve to new. Before installation of
hoses, apply antiseize compound on male threads of fittings.
Lightly coat new O-rings with clean oil before installation.
1.
Install new O-ring (15) in end of hose (14) and connect hose to bottom of hydraulic control valve (2).
2.
Position hydraulic control valve (2) to fender brace assembly (13) and install two capscrews (12), washers (11) and nuts
(10).
3.
Install new O-ring (9) on hose (8) and connect hose to side of hydraulic control valve (2).
4.
Install new O-ring (7) on hose (6) and connect hose to front face of hydraulic control valve (2).
5.
Install new O-ring (5) on hose (4) and connect hose to front face of hydraulic control valve (2).
6.
Install new O-ring (3) on hose (1) and connect hose to front face of hydraulic control valve (2).
7.
Check oil level in hydraulic tank. Refill system tank and bleed air from system, as required (WP 0225 00).
8.
Operate machine and ensure hydraulic system is operating properly and no leaks are evident.
9.
Install floor plates (WP 0171 00).
END OF WORK PACKAGE
0203 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business