|
|
TM 5-2410-237-23
WINCH ASSEMBLY PRESSURE TESTS - CONTINUED
0190 01
TEST SETUP - CONTINUED
CAUTION
Wipe area clean around control valve pressure taps to ensure contamination does not enter winch. Contam-
ination of winch could result in premature failure.
NOTE
Pressure taps (1 and 2) are to the rear. Pressure tap (3) is forward.
4.
Wipe area clean around plugs at pressure taps (1, 2 and
3
3).
2
1
387-388
5.
Remove three plugs (4) from winch control valve.
4,5
Remove O-ring (5) from each plug and discard.
4,5
387-388
6.
Install 0-60 psi pressure gage in pressure tap (3).
7.
Install 0-600 psi pressure gages in pressure taps (1 and 2).
0190 01-2
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |