TM 5-2410-237-23
WINCH LINES AND FITTINGS REPLACEMENT - CONTINUED
0190 00
INSTALLATION - CONTINUED
6.
Install connector (7) with new O-ring (8) into winch control valve.
7.
Connect hose (1) to connector (7).
8.
Install new O-ring (12) in end of hose (4). Install hose to magnetic strainer assembly housing with two split flanges (11),
four washers (10) and bolts (9).
9.
Secure hose (4) to bracket (17) with clip (16), capscrew (13), new lockwasher (14) and nut (15).
10.
Secure hose (1) with clip (20), spacer (19) and capscrew (18).
11.
Tie hoses (1 and 4) together with three new straps (21).
12.
Install floor plates (WP 0171 00).
13.
Check level of oil in winch sight gage and add oil as needed (WP 0179 00).
14.
Start engine and run at low idle. Ensure that oil is visible in sight gage. Add oil if necessary (WP 0179 00).
15.
Check winch for proper operation and leaks (TM 5-2410-237-10).
END OF WORK PACKAGE