|
|
TM 5-2410-237-23
STEERING CLUTCH CONTROL VALVE MAINTENANCE
THIS WORK PACKAGE COVERS
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation
INITIAL SETUP
Materials/Parts - Continued
Tools and Special Tools
Capscrew, course thread, 3/8 in.
Tool kit, general mechanic's (Item 122, WP 0250
Gasket (35)
Shop equipment, general purpose repair (Item 106,
Lockwasher (19, 22, 27 and 39)
O-ring (12, 14, 24, 25, 28 and 53)
Materials/Parts
Pin, cotter (15 and 67)
Cap set, protective (Item 2, WP 0249 00)
Seal (65)
Cleaning compound, solvent (Item 4, WP 0249 00)
References
Compound, gasket forming, silicone (Item 7, WP
TM 5-2410-237-10
Oil, lubricating (Item 26, WP 0249 00)
Equipment Condition
Rag, wiping (Item 29, WP 0249 00)
Fuel tank removed (WP 0052 00)
Tag, marker (Item 37, WP 0249 00)
REMOVAL
CAUTION
Wipe area clean around all hydraulic connections to be opened during removal and disassembly. Cap oil
lines and plug openings after removing lines. Contamination of hydraulic system could result in premature
failure.
NOTE
Tag hydraulic lines as needed to ensure correct installation.
Use a suitable container to capture any draining oil. Dispose of oil IAW local policy and ordinances.
Ensure all spills are cleaned up.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |