Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
TURBOCHARGER ASSEMBLY REPLACEMENT - CONTINUED
0049 00
INSTALLATION
NOTE
If adapter has been removed, perform step 1. If it has not been removed, start installation of turbo-
charger at step 2.
Wipe all sealing surfaces clean and dry before installing new seals and gaskets. Apply a light film of
clean oil to new seals prior to installation.
1.
Install new gasket (15) and adapter (8) on exhaust manifold with four capscrews (14) and nuts (13).
2.
Position new gasket (12) on adapter (8).
3.
Position turbocharger (7) on adapter (8) and insert elbow (11) in output side of turbocharger.
4.
Apply antiseize compound to four capscrews (6).
5.
Align bolt holes in turbocharger (7), gasket (12) and adapter (8). Install four capscrews (6) and nuts (5).
6.
Install capscrew (9) and retainer (10) to elbow (11) and turbocharger (7).
7.
Install two new seals (4) on each end of turbocharger
4
2
elbow (3) and insert one end of elbow in air cleaner
outlet (2).
3
387-164
8.
Insert elbow (3) in turbocharger (7) and install air
2
cleaner outlet (2) on engine intake pipe (16) with four
7
capscrews (1).
9.
Install air cleaner (WP 0046 00).
10.
Install turbocharger oil lines (WP 0051 00).
11.
Install muffler (WP 0062 00)
12.
Crank engine for 10 seconds before starting to pre-
lubricate turbocharger.
13.
Run engine and check for proper operation (TM 5-
1
2410-237-10).
3
16
387-163
END OF WORK PACKAGE
0049 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business