|
|
TM 5-2410-233-23
PREPARATION FOR STORAGE AND SHIPMENT
THIS WORK PACKAGE COVERS
Preparation for storage
Preparation for shipment
INITIAL SETUP
References
Tools and Special Tools
TM 5-2410-233-10
Tool kit, general mechanic's (Item 112, WP 0185
Materials/Parts
Equipment Condition
Grease (Item 15, WP 0184 00)
Machine parked on level ground (TM 5-2410-233-
10)
Tape (Item 36, WP 0184 00)
PREPARATION FOR STORAGE
1.
Perform Operator Preventive Maintenance Checks and Services (PMCS) (TM 5-2410-233-10).
2.
Perform Unit Maintenance Preventive Maintenance Checks and Services (PMCS) contained in WP 0008 00 and
3.
Schedule the next PMCS on DD Form 814, Preventive Maintenance Schedule and Record.
4.
Store tractor with blade (and ripper if equipped) lowered. Cycle controls after engine shutdown to relieve any
hydraulic pressure in system.
5.
Seal exhaust stack opening and engine air cleaner precleaner opening with tape.
6.
Coat exposed metal portions of blade (and ripper if equipped) cylinder rods with grease.
7.
Cover seat, armrests and dash with protective plastic wrap.
8.
Fill fuel tank completely.
9.
Ensure that fuel drain valve handle, battery box, engine oil filler tube, fuel tank cap, engine oil level gage, hydraulic
tank cover, dash cover, seat assembly and radiator cover are protected.
10.
Ensure that tractor is fully equipped. Refer to TM 5-2410-233-10HR.
11.
Fill in DD Form 1397 completely and attach to a conspicuous part of the tractor.
PREPARATION FOR SHIPMENT
1.
Perform Operator Preventive Maintenance Checks and Services (PMCS) contained in TM 5-2410-233-10.
2.
Perform Unit Maintenance Preventive Maintenance Checks and Services (PMCS) contained in WP 0008 00 and WP
3.
Schedule the next PMCS on DD Form 814, Preventive Maintenance Schedule and Record.
4.
Seal exhaust stack opening and engine air cleaner precleaner opening with tape.
5.
Consult shipping and transportation data on data plate (TM 5-2410-233-10).
END OF WORK PACKAGE
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |