Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
RIPPER SHANK REPLACEMENT - CONTINUED
0175 00
INSTALLATION
1.
Position shank (3) under beam (2).
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may result in injury or death to
personnel.
NOTE
Ripper shank weighs 328 lb (149 kg).
If installing on a hard surface, remove ripper tooth for clearance (WP 0174 00). If installing
on a soft surface, a small hole about 10 in. (25.4 cm) deep can be dug to provide enough clear-
ance.
2.
Attach a nylon sling and a suitable lifting device to lifting eye in shank (3). Feed sling up through opening in bottom of
beam (2).
3.
Lift shank (3) into position and insert pin (4). Drive pin through beam (2) and shank.
4.
Install retainer (6) at each end of pin (4). Align holes in retainers and pin, and install new cotter pin (5) at each end of
pin.
5.
Start engine, raise ripper and remove blocks.
6.
Remove nylon sling and lifting device from shank (3).
7.
Check ripper for proper operation (TM 5-2410-233-10).
8.
Lower ripper and shut down engine (TM 5-2410-233-10).
END OF WORK PACKAGE
0175 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business