Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
RIPPER TOOTH REPLACEMENT - CONTINUED
0174 00
INSTALLATION
1.
If removed, install guard (6) or guard (7) by positioning guard and driving in pin (8).
NOTE
Ripper tooth weighs 24 lb (11 kg).
2.
Slide tooth (2) over end of shank (5).Slide tooth (2) over end of shank (5).
3.
Insert pin (4) through tooth (2) and shank (5).
4.
From L.H. side of tooth (2), drive pin (4) until flush on both sides of tooth.
1
3
7
8
2
2
5
4
8
6
386-585
386-586
5.
Repeat steps 2 through 4 for other teeth.
6.
Start engine, raise ripper, remove blocks, lower ripper and turn off engine (TM 5-2410-233-10).
END OF WORK PACKAGE
0174 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business