Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
HYDRAULIC TANK REPLACEMENT - CONTINUED
0166 00
INSTALLATION - CONTINUED
11.
Remove both lifting links from top of hydraulic tank (7).
12.
Install four washers (9) and capscrews (8) on hydraulic tank (7).
13.
Install rear, front and middle guards (6, 4 and 5) on side of hydraulic tank (7) with six washers (3), new lockwashers (2)
and capscrews (1).
8
9
7
6
5
23
1
4
386-674
14.
If equipped, connect ripper control linkage (WP 0153 00).
15.
Connect blade control linkage (WP 0152 00).
16.
Refill hydraulic tank and bleed air from system (WP 0165 00).
17.
Operate machine and check for leaks and proper hydraulic system operation (TM 5-2410-233-10).
END OF WORK PACKAGE
0166 00-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business