Click here to make tpub.com your Home Page

Page Title: MAIN (BULLDOZER) CONTROL VALVE INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
MAIN (BULLDOZER) CONTROL VALVE, RIPPER CONTROL VALVE
AND RELIEF VALVE REPLACEMENT - CONTINUED
0151 00
MAIN (BULLDOZER) CONTROL VALVE INSTALLATION
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may result in injury or death to
personnel.
NOTE
Tighten all mounting bolts IAW with Torque Limits (WP 0180 00).
Main (bulldozer) control valve weighs approximately 75 lb (32 kg).
Apply sealing compound to control valve mounting bolts before installation.
1.
Position main (bulldozer) control valve (29) on bottom plate (8).
2.
Install two new lockwashers (33) and bolts (32) to secure main (bulldozer) control valve (29) to bottom plate (8).
3.
Position new gaskets (31) and oil line (28) with end caps (27) on main (bulldozer) control valve (29) and ripper control
valve (30). Secure with two new lockwashers (26) and bolts (25) in each end cap.
4.
Position new gasket (24) and pump suction tube (23) on bottom plate (8). Secure with three new lockwashers (22) and
bolts (21).
0151 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business