Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
TRACK ROLLER GUARD REPLACEMENT - CONTINUED
0112 00
REMOVAL - CONTINUED
2.
Place wooden blocks between track assembly and outer guard (4) at each end.
3.
Remove 11 bolts (5) and washers (6) that secure outer guard (4). Use bolts to lower outer guard onto wooden blocks.
Remove outer guard.
4.
Remove five spacers (7) from inner rods (3).
5.
Remove five rods (7) from inner guard (8).
6.
Place wooden blocks between track assembly and inner guard (8) at each end.
7.
Remove nine bolts (5) and washers (6) that hold inner guard (8). Use bolts to lower inner guard onto wooden blocks.
Remove inner guard.
1
7
3
6
5
8
2
1
4
386-257
INSTALLATION
NOTE
Apply antiseize compound to all guard mounting bolts before installation.
1.
Position inner guard (8) on track roller frame and loosely install nine bolts (5) and washers (6).
2.
Feed rods (3) through outer guard (4).
3.
Place spacers (7) over rods (3).
4.
Position outer guard (4) on track roller frame and loosely install 11 bolts (5) and washers (6).
5.
Feed rods (3) through outer guard (4).
6.
Loosely install five new lockwashers (2) and nuts (1) on ends of rod (3) on outer guard side.
7.
Fully tighten 20 bolts (5) on outer and inner guards (4 and 8) to 500 lb-ft (678 Nm).
8.
Tighten ten nuts (1) on rods (3) to 265 lb-ft (359 Nm).
END OF WORK PACKAGE
0112 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business