|
|
TM 5-2410-233-23
TRANSMISSION OIL PUMP REPLACEMENT - CONTINUED
0095 00
INSTALLATION - CONTINUED
4.
Install R.H. guard assembly (4) with three new lockwashers (3), flatwashers (2) and capscrews (1).
5.
Install transmission oil sampling valve, if equipped (WP 0090 00).
6.
Check transmission oil level and add as required (WP 0086 00).
7.
Run engine and check for leaks at pump (TM 5-2410-233-10).
4
1, 2, 3
1, 2, 3
386-404
END OF WORK PACKAGE
0095 00-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |