Click here to make tpub.com your Home Page

Page Title: SERVICE UPON RECEIPT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
SERVICE UPON RECEIPT
GENERAL
1.
When a used or reconditioned D7F Tractor is first received, determine whether it has been properly prepared for service
and is in condition to perform its mission.
2.
Follow the inspection and servicing instructions that follow.
INSPECTION INSTRUCTIONS
1.
Read and follow all precautions and instructions on DD Form 1397, Processing and Deprocessing Record for Shipment,
Storage and Issue of Vehicles and Spare Engines.
2.
Remove all packing and shipping material, such as tape, tie downs, protective covers and shipping seals.
WARNING
Solvent cleaning compound MIL-PRF-680 Type III is an environmentally compliant and low toxic mate-
rial. However, it may be irritating to the eyes and skin. Use protective gloves and goggles. Use in well-venti-
lated areas. Keep away from open flames and other sources of ignition.
3.
Clean any exposed metal parts coated with rust preventive compound. Use solvent cleaning compound (Item 4, WP
4.
Inspect equipment for any damage incurred during shipment. Check if equipment has been modified.
5.
Check equipment against packing slip to ensure that shipment is complete. Report any discrepancies on SF Form 368,
Product Quality Deficiency Report.
6.
Clean all external surfaces as needed. Touch up any paint scratches.
7.
Remove all Basic Issue Item (BII), Additional Authorization List (AAL), and Components of End Item (COEI) equip-
ment and stow in accordance with TM 5-2410-233-10.
8.
Install exhaust extension on muffler (WP 0059 00).
9.
If equipped with ripper, install ripper shanks (WP 0175 00).
SERVICING INSTRUCTIONS
1.
Service machine in accordance with PMCS instructions in TM 5-2410-233-10 and PMCS instructions in this manual
(WP 0008 00 and WP 0009 00). Schedule the next PMCS on DA Form 2404 or DA Form 5988-E, Equipment Inspection
and Maintenance Worksheet.
2.
Refer to TM 5-2410-233-10 and perform functional checks of all major machine systems to ensure machine is ready for
operation. Remove all warning tags.
END OF WORK PACKAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business